Several days have passed and the bathroom is nearly finished. The putty is drying and then the paint will be applied. The color has yet to be determined.
Friday, December 18, 2009
Almost done
Wednesday, December 9, 2009
Tuesday, December 8, 2009
Durock installed
The bathroom is looking less like scrap wood and more like a finished puzzle. The concrete board has been put in place today – a one man job totaling < 6 hours.
Sunday, December 6, 2009
Making progress on the bathroom remodel
After toying with the idea of how to replace the stand up shower, we basically threw out all plans and decided on a completely different direction by closing off the area where the old stand up shower once stood (this will allow for ample in-bathroom storage), installing a new tub outside the bathroom where “dead space” once occupied the pass between the small bathroom to the walk-in closet, removing the original oak hard wood floor where the bathroom expansion lies, laying tile for the new bathroom floor, and constructing a new wall for entry to the new larger bathroom and walk-in closet.
After two days (roughly 10 hours x 3 men) of demolition and construction these are the resulting pictures. Luckily the 2nd-story exterior wall does not sit in line with the first floor. When the workers removed the toilet, the pipe supplying the toilet broke. I watched from the living room as water gushed down the dining room window. We hurried to the basement to shut off the water.
Monday, February 23, 2009
Bamboo Flooring




Challenge: Tear out mom's old and failing linoleum kitchen/bath room/garage entry floor (232 sq. ft.). You know, the kind that is glued down forever and is about 1/8 inch thick cork board (not at all like a soft malleable vinyl floor) that is mostly brittle but dangerously sharp to the touch when chiseling out. Then lay a new floor, bamboo floor.
We contemplated vinyl but who wants vinyl? Patterned in some way that you will have to convince yourself you can live with but only to discover 5 years later you absolutely hate it! And at roughly double the cost of vinyl you can enjoy the blissful feeling of being in Asia or your favorite tropical beach place.
So we picked the day to rent the tools. We went to Sunbelt Tool rental attached to Lowe's. We picked up an air compressor to power the staple gun and also a nail gun for perimeter finishing and hard to reach areas. We were off on our merry little way.
Tools and supplies:
- air compressor/hose/mallet $32/day
- staple gun $26/day
- finish nailer $26
- staples 1 box $12
- nails 1 pack $8
- 15 in. pry crow bar
- chisel
- spare wood block
- table saw
- hammer
Working Backwards: One technique I developed involves laying out all the planks until I reach the perimeter where I would need to start. I would then nail down every other plank to maintain the right spacing. The in between planks can slide out to allow proper stapling. The only area on the boards that won't get stapled would be those joining the previously nailed spacer planks. Make these spacer planks 6 inches or so in length - the shorter they are the more area you'll have on the joining plank to staple. Another challenge with working backwards - the plank tends to move in the direction the staple is driven which is opposite the direction the planks are added. This 'movement' space adds up and can be detrimental to a smooth sectional join when you finally reach the bridge area.
Final Thoughts: Cutting the pieces was by far the most time consuming. I'm sure a jigsaw would have helped with shaping the planks in and around doors/molding/slanting walls. We decided to saw/chisel the door frame molding instead of removing to saw. Ultimately it would have been better to remove them but under the time constraints we chose the quick route. The more you can remove from the room the better - cabinets, walls, furniture, appliances. Removing stapled boards wasn't that difficult. The staple rips right through the board and then you just break the staple after many bends with pliers or use the hammer to pull it out. Bamboo shreds easy. When I wanted a ripped board for the perimeter I could cut the plank half way and then pull it apart the rest of the way. The floor looks great. Definitely worth all the pain and agony. The key to a perfect interlocking floor is starting at the widest section and moving in one direction. A 'one day' job, what were we thinking? We barely finished this morning!
Total Cost: materials $769 + rental $40 + labor $0 = $819 or $3.53/sq. ft. installed